Major Accomplishments


1. Erection and commissioning of Coke Oven Gas Refinery Phase #1 expansion of Esfahan     Mill industry (Zoub Ahan).

 2. Erection and commissioning of the entire Oxygen Production unit Phase #1 expansion of      Esfahan Mill insustry.

 3. Installation and commissioning of the Ring Grinding Section if Tabriz Iranian Bearing      Company.

 4. Erection of steel structure and mounting of the Bridge cranes & also installation of      continous casting equipment at Mobarakeh Steel Complex Plant Unit 08.

 5. Erection of pressuized oxygen & nitrogen vessels of Oxygen Production Unit at Mobarakeh      Steel Complex PU 14.

 6. Erection of potable water tanks of Mobarakeh Steel Complex.

 7. Equipment erection piping and erection of steel structure for Hot Strip Mill at Mobarakeh      Steel Complex PU 51.

 8. Maintenance of installed equipment at Esfahan Mill industry (Zoub Ahan)

 9. Erection and commissioning of electrical system instrumentation and mechanical      equipment along with piping and ventilation systems at Mobarakeh Steel Complex PU 55.

10. Erection of mechanical equipment, steel structures, above ground under ground piping,       electrical and instrumentation in the Tank farm area of Esfahan Petrochemical Complex.